CU240E of transducer of Xi Menzi G120

  • Time:
  • Click:157
Problem: Midrib of G120 transducer CU240E-2 develops the application of the input. The answer: In unit of control of the CU240E-2 in G120 transducer, can DI3 (T.

8) uses as pulse inputs interface, through detecting pulse frequency comes speed of monitoring electric machinery, also can use as the speed set value of electric machinery. Transducer can handle the pulse array of most 32Khz. Relevant parameter: Parameter describes P0580 to measure the input terminal of the head, acquiesce is 0, the setting is 23 when, DI3 inputs interface as pulse. P0581 measures the pulse edge choice of the head: Install 0, ascendant edge is effective; Install 1, drop to measure a head along effective P0582 every turn pulse is counted (acquiescent setting is 1) P0583 measures a head the biggest measure time (acquiescent 10s) , if appear without new pulse inside this time, think pulse inputs a value for 0, namely R0586=0. When having new pulse, time afresh. The transmission coefficient that P0585 measures a head (acquiesce is 1) , namely electric machinery and the drive that measure the place are compared. P0490 is taken measure a head instead, of this parameter 3 can take the input signal that measures head DI3 instead. Exemple 1 pulse input serves as transducer of speed feedback monitoring to procrastinate move transmission load, take-off installs sensor to be used at monitoring load rotate speed, hypothesis take-off turns circuit outputs 3 pulse, the drive of electric machinery axis and take-off is compared for 10:1, when electric machinery effective rate and detect the value differs information of breakdown of the output when exceeding 200rpm. Parameter setting: P0580=23; P0581=0; P0582=3; P0583=10; P0585=10; R0586 is the value of actual rotate speed of electric machinery namely. P3230=586; The origin P3231=200 that electric machinery is worth actually; P2192=5 of deviation limiting value; P2193=2 of the movement after defer 5s; P2181= of monitoring load speed? ; Speed out of tolerance moves elect, when need output calls the police, can install 1 or 3, when outputting breakdown, can install 4 or 6. Exemple if need to use input pulse frequency to regard electric machinery frequency as set,2 pulse input regards set of electric machinery speed as the value value source, pulse of hypothesis input 10khz is corresponding 2 pairs extremely set of electric machinery speed is worth 1500rpm. Parameter setting: P0580=23; P0581=0; P0582=200; Computational formula 200=10000/ (1500*2/60) P0583=10; P0585=1; P1070=586; Attention: 1, transducer inputs the frequency of pulse through detecting and computation feedbacks as speed or speed set is worth, but cannot realize positional control. 2, modification P0580 is worth, if transducer signs up for F1044 breakdown, p0971=1 of need general parameter, cut off the power next breakdown of new electrify restoration. The keyword inputs application of pulse G120 CU240E-2 CNC Milling